Engineer conducting site survey
Independent · Documented · Actionable

Site Surveys & Assessments
You Can Act On

Before you deploy, migrate, or acquire — know exactly what you're working with. Our engineers produce rigorous, photographic assessments that eliminate guesswork and prevent expensive surprises.

48hr report turnaround
Photographic evidence
CMDB-ready exports
CAD-accurate rack diagrams

48hr

Report turnaround

From survey completion

2,000+

Sites surveyed

Across 76 countries

100%

On-site attendance

No remote-only assessments

76+

Countries

Active survey capability

Survey Types

Six Surveys. One Team.

Every assessment is carried out by qualified engineers on-site — not a remote questionnaire.

Pre-Deployment Assessment

Before a single rack arrives, we walk the floor. Power capacity, cooling headroom, raised floor load, cable routes, cross-connect availability — everything your installation team needs to avoid day-one surprises.

  • Power feed verification & capacity modelling
  • Cooling airflow & hot-aisle analysis
  • Raised floor load & structural assessment
  • Rack space & U-space inventory

Infrastructure Audit

Your estate has grown for years. Nobody actually knows what's in those racks. We walk every row, photograph every asset, record serials and warranties, and hand you a verified inventory you can actually trust.

  • Full rack-elevation diagrams
  • Asset serial & warranty capture
  • Cable plant mapping & labelling
  • CMDB-ready export (CSV / JSON / Excel)

Migration Readiness Survey

Moving workloads, consolidating sites, or replacing aging hardware? We validate that the target environment can receive what you're planning to move — before the migration crew shows up.

  • Target site capacity validation
  • Network connectivity & latency checks
  • Cross-connect and circuit inventory
  • Risk register for migration planning

M&A Due Diligence

Acquiring a company comes with unknown infrastructure. We produce an independent, objective assessment of the target's IT estate — condition, age, risk, and realistic refresh cost — before you sign.

  • Hardware condition & end-of-life report
  • Licence and support contract review
  • Security posture and access control audit
  • Estimated refresh cost model

Network & Connectivity Survey

WiFi dead spots, over-subscribed WAN links, or dark fibre nobody catalogued — our network engineers survey physical and logical infrastructure and produce a clear picture of what you actually have.

  • WiFi heatmapping & interference analysis
  • WAN circuit identification & testing
  • Switch port utilisation audit
  • Fibre route and splice documentation

Power & Cooling Audit

Datacenters often operate with no headroom and no visibility. We measure actual power draw, identify unbalanced feeds, test UPS health, and map airflow — giving you data to plan safely.

  • PDU and circuit load measurement
  • UPS health & runtime testing
  • Thermal imaging of hot spots
  • PUE estimation & improvement recommendations
What You Receive

Not a Spreadsheet. A Decision-Ready Report.

Every survey produces a structured deliverable pack you can hand directly to your engineering team, project manager, or board.

Photographic report

Every rack, panel, and cable run — timestamped and geotagged.

Rack elevation diagrams

Accurate U-space drawings, exportable to Visio or PDF.

Written assessment report

Executive summary + technical appendix. Ready for board or engineering.

Cable & connectivity maps

Point-to-point cable routes, cross-connects, and patch documentation.

Thermal & power data

Measured load figures, UPS health, airflow hot-spot locations.

Risk & recommendations

Prioritised action list with effort/cost estimates for each finding.

When To Use Us

The Cost of Not Knowing

Every major infrastructure decision made without an on-site survey carries hidden risk. The survey cost is a rounding error compared to a failed deployment, a botched migration, or an acquisition that comes with unknown technical debt.

Our reports are written for engineers but structured for stakeholders — you get the technical depth your team needs and the executive summary your leadership expects.

New DC deployment

Validate a facility before committing hardware spend. Avoid costly retrofits by knowing constraints upfront.

Hardware refresh

Understand exactly what needs replacing, in what order, and what the target state looks like before a single PO is raised.

Co-location move-in

Confirm the colo's claims about power, cooling and connectivity match reality before you sign a long-term contract.

Compliance audit prep

ISO 27001, PCI-DSS, SOC 2 — auditors want evidence of what's running where. We give you that baseline documentation.

Post-incident assessment

After a failure or near-miss, an independent survey identifies root cause and confirms no further risk is hidden in the estate.

Merger & acquisition

Know exactly what IT infrastructure you're inheriting — condition, risk, and realistic cost to bring it to standard.

Know Before You Build.
Survey First.

Tell us the site address, the scope of work, and your timeline. We'll confirm engineer availability and provide a fixed-price quote within 24 hours.